Penwortham Battery Storage
Maximising the existing grid offer through doubling the on-site capacity of battery storage.
Headlines
Electrical, civils and earthing design
All joints and terminations up to 33kV
Isolation and energisation control up to handover to end client
Rewiring to reconfigure site 7 Sungrow Bess Units and 7 Sungrow PCS units
De-energisation of 8 PCS units
Dead testing and live testing of the LV cables to NICEIC standards, BS7671 18th edition regulations.
Design and installation for new 33kV ring to energise PCS units
Supply and installation of LV auxiliary feeds to LV switch room
Phase energisation to allow for manufacture commissioning of BESS units
This Lancashire site was a fast-paced project where we had to mobilise quickly and hit the ground running. From reconfiguring the BESS units, to installing the 33kV ring and completing all terminations, it was a real team effort to deliver technical solutions that met the client’s needs.
James Binion - Sinewave Project Manager