Penwortham Battery Storage

Maximising the existing grid offer through doubling the on-site capacity of battery storage.

Headlines

  • Electrical, civils and earthing design

  • All joints and terminations up to 33kV

  • Isolation and energisation control up to handover to end client

  • Rewiring to reconfigure site 7 Sungrow Bess Units and 7 Sungrow PCS units

  • De-energisation of 8 PCS units

  • Dead testing and live testing of the LV cables to NICEIC standards, BS7671 18th edition regulations.

  • Design and installation for new 33kV ring to energise PCS units

  • Supply and installation of LV auxiliary feeds to LV switch room

  • Phase energisation to allow for manufacture commissioning of BESS units

This Lancashire site was a fast-paced project where we had to mobilise quickly and hit the ground running. From reconfiguring the BESS units, to installing the 33kV ring and completing all terminations, it was a real team effort to deliver technical solutions that met the client’s needs.

James Binion - Sinewave Project Manager